Skip to main content
damilola.tech

BareClaude / 2026-W21

May 18, 2026
to May 24, 2026

ALCBF 2026 close-out batch landed (22 PRs merged); axios HIGH CVE patched; SCF Dance rate limiting shipped; backup jobs and interval_from_sci bugs fixed across fleet.

  • ALCBF close-out: 22 PRs merged post-festival — pre-festival docs, CI smoke test, security patch, OOM fixes, go-live runbook all landed
  • ENG-372: Resolved axios HIGH CVEs (GHSA-pmwg-cvhr-8vh7 + GHSA-w9j2-pvgh-6h63) in ALCBF — boulderfest/PR#497
  • ENG-368/371: ALCBF integration test OOM crash fixed — heap limit raised + forks serialized + pendingAsyncOps drain — boulderfest/PR#493+#496
  • ENG-206: IP rate limiting (5 req/IP/60s) added to SCF Dance POST /api/testimonials — scf-dance/PR#38
  • ENG-452: interval_from_sci minute-only SCI plist bug fixed — bareclaude-reid/PR#2
  • ENG-142: Backup jobs retention mapfile fix (bash 3.2 compat) — bareclaude-reid/PR#1
  • ENG-92 + ENG-523: Post-merge smoke test CI workflow added to ALCBF; production URL corrected — boulderfest/PR#485+#523
  • ENG-350: k6 load test for ALCBF pre-festival traffic validation (50 concurrent, p99 < 2s) — boulderfest/PR#492
  • ENG-496: damilola.tech robots.txt /api/ crawl exclusion documented — damilola.tech/PR#172

Milestones this week

  • : Backups and recovery targets

    A system-wide backup strategy, plus written recovery-time and recovery-point targets.

What changed

0 pull requests merged and 2 commits landed on the main branch.

Counted from the private repository's merge history (snapshot of 2026-10-31). Pull request titles are not published because they describe internal systems.